The Tohoku Shinkansen line between Tokyo and Morioka stations has been suspended due to strong winds recorded beyond safe operational limits. JR East has not specified when services will resume, following a peak wind speed of 34 meters per second in Miyagi Prefecture.
The Tohoku Shinkansen line, connecting Tokyo and Morioka stations, has been suspended since 10:30 a.m. on March 26, 2025, due to severe wind conditions as reported by East Japan Railway Company (JR East). An anemometer located between Sendai and Shiroishi Zao stations recorded winds exceeding the operational limits for train services. JR East has not provided an estimated time for the resumption of train services.
The Japan Meteorological Agency reported that Shiroishi, situated in Miyagi Prefecture, experienced a peak instantaneous wind speed of 34 meters per second at 10 a.m., marking the highest recorded wind speed for March in that area. The adverse weather conditions exemplify the challenges associated with seasonal changes in Japan, particularly affecting transportation services.
In summary, the Tohoku Shinkansen line has been suspended due to strong winds, with no current timeline for resumption. The wind speeds recorded are noteworthy and have disrupted operations on this vital rail route, underscoring the impact of weather on public transport in Japan.
Original Source: japannews.yomiuri.co.jp